Bathroom

Salter Point Disability access modification

Project Description

Our clients contacted us in need of a conversion of their existing bathroom space into a much more accessibility friendly space. This involved widening existing door frames to 920mm wide doors, cutting in a door way from the rear of the property through to the attached rear living space, and re designing the existing space to turn it into a wet room. Time was of the essence as the room had to be ready for the return of the clients father from hospital. We surpassed their expectations and had the room ready 9 days earlier than promised. 

Project Details

  • Project Type:

    Bathroom

  • Client:

    R and J Farrow

  • Completion Time:

    12 days

  • Location:

    Salter Point

  • Contract Value:

    $13,905.11